Try it with your numbers
A quick make-ready estimate with a PDF you can download or send. A guide, not a quote: a trial on your press gives the real figure.
Make-ready time: quick estimate
Five numbers about your press room. We compare your make-ready time with the Pulse target of a 30-minute changeover. A guide, not a quote: a trial on your press gives the real figure.
Pulse target: 30 min changeover min
Example figures
Send it
Add your name and number, then send this estimate by WhatsApp or email.
How it’s worked out: minutes per changeover × changeovers per press per day × presses ÷ 60 = hours per day; × working days per year = hours per year; × press cost per hour = cost per year. Worked out at your minutes and at the Pulse target; the difference is your potential saving. Example inputs (240 working days = 48 weeks × 5 days), not data from a customer.
Ink volume: now and with Monolox
Ink for one run from your current anilox volume (or wet ink film weight), side by side with Monolox at Pulse’s standard 5.5 cm³/m².
Assumptions
- Ink (kg) = anilox volume (cm³/m²) × transfer × run length (m²) × ink density (g/cm³) ÷ 1000.
- Cell evacuation (ink transfer): 20% of the anilox volume reaches the substrate (standard 20%, change it above).
- Ink density: 1.00 g/cm³, a working assumption to be confirmed (change it here).
- 1 BCM = 1.55 cm³/m².
- Monolox: Pulse’s standard fixed anilox volume, 5.5 cm³/m².
- With wet ink film weight: your film weight is the ink laid now; Monolox = 5.5 × transfer × density.
- 1 kg = 2.20462 lb.
Estimates only: your actual saving is confirmed by calibration and a press trial.
Make-ready, waste and ink together
Uses the figures you entered in Make Ready and Ink Volume, so nothing is asked twice. Add your jobs per month for the yearly figure.
Using your figures
- Pulse target
- Ink saved per run
Assumptions
- One job = one changeover.
- Make-ready time per job: (your make-ready minutes − the Pulse target) ÷ 60 × press cost per hour.
- Waste per job: cost per metre × waste per pull × pulls per job × 20%.
- Ink per job: the money saved on one run in Ink Volume.
- Per year = per job × jobs per month × 12.
- Cell evacuation (ink transfer): 20% of the anilox volume reaches the substrate (standard 20%, change it above).
- Ink density: 1.00 g/cm³, a working assumption to be confirmed (change it here).
- 1 BCM = 1.55 cm³/m².
- Monolox: Pulse’s standard fixed anilox volume, 5.5 cm³/m².
Estimates only: your actual saving is confirmed by calibration and a press trial.
